About the Project

Provided turnkey engineering, construction, and project management services for the upgrade of eleven (11) pipeline booster pump stations on a pipeline transporting refined liquid petroleum.

Arseal’s turnkey services included the following responsibilities:

  • Electrical engineering and design:
    • Develop complete electrical drawing sets for construction.
    • Design and inspect new PLC and control cabinets and panels.
    • Specify materials and equipment.
    • Provide installation and commissioning support to electrical contractor.
    • Obtain and implement as-builts on record drawings.
    • Create P&ID and loop diagram drawings.
  • Automation and controls:
    • Develop and rigorously test PLC and HMI programs.
    • Coordinate with SCADA group for pre-testing and commissioning point-to-point checkout.
    • Conduct testing during commissioning to ensure control system and communications function safely and accurately.
    • Create documents including maintenance manuals, testing check lists, functional specifications and block diagrams, communication architecture diagrams, I/O lists, SCADA data maps, and HMI operations manuals.
  • Construction:
    • Provide/manage Internal Electrical sub-contractor, furnish necessary electrical material.
    • Coordinate with 3rd-party Electrical sub-contractor.
  • Project Management:
    • Schedule Front-End-Loading/Data-Gathering site visits.
    • Interface with client to provide project status and identify issues.
    • Ensure engineering design and construction progressing safely, accurately, and on schedule.
    • Coordinate with client to schedule pipeline downtime for commissioning.
    • Schedule/Drive milestone meetings during planning & execution of project.

Arseal’s turnkey services allowed the client to safely and efficiently complete all the facility upgrades under budget and in less than 2 years.

Project Info

Client : Colonial Pipeline