|
|
| |
November 21, 2008 |
 | ABOUT US |
 | SERVICES |
 | PROJECTS |
 | CLIENTS |
 | CAREERS |
 | CONTACT |
 |
|
|
|
|
|
| |
|
| |
| Title: |
 |
| Rack Upgrade and Automation |
| Location: |
| Texas |
| |
| Project Description: |
A liquid product terminal required an upgrade of the control system. Arseal designed and put into service the facility upgrade for the truck loading rack that included the following major elements:
|
- Replacement of an Allen-Bradley Panelview with Cimplicity HMI 5.1 that supports product/additive pump controls, tank level display and alarming.
- Implement Ethernet communication link for the HMI utilizing 1761-NET-ENI Ethernet to serial adapter.
- Provide new communication link between the existing truck rack PLC and vapor recovery unit PLC (SLC500) for data transfer and alarm functions.
- Prepared project commissioning plan and carried it out with local technical staff under tight schedule.
|
|
The success of the project implementation was based on good and frequent communications with the Operations, Engineering and local Technical staff.
|
|
Let Arseal help you with your next tank farm expansion.
|
|
|
| |
|
|
|
|
|
|